“Our Eco-Friendly Solutions For rapid Bio-Remediation and Recycling Provides Zero Impact on Environment”
Rapid, All-Natural Treatment Solutions
Bio-Remediation, itself, has experienced significant technological advances over the past few decades. What used to be a “one-size-fits-all” remedy, that not only took a long time to work, but also didn’t work across the entire chain of hydrocarbons, has been drastically improved through science. Bio-remedies can now target every level of hydrocarbon and eliminate them in a very rapid timeframe, and we at Boldwater employ a state-of-the-art bio-solution in our remediation services. Using our all-natural enzyme solution, light hydrocarbons are eliminated within seconds and heavier hydrocarbons are eliminated within hours. In a nutshell, we can virtually erase any hydrocarbon-related activity and return the local area to its native condition.
Improved Air Quality
Because the Boldwater process eliminates the need for transporting hazardous drilling waste to a dumping facility, dozens of heavy-haul trucks are eliminated for every drilling project. This improves local air quality by avoiding both combustion emissions as well as airborne dust from dirt roads.
"Boldwater Helps You Remain in Good Standing as A Member of the Communities In Which You Operate”
Footprint Minimization
Another benefit of Bio-Remediation practices is that it typically can be accomplished in a much smaller physical area than other methods of oil & gas activity. Boldwater is permitted to perform onsite bio-treatment and recycling and, as such, the use of our Bio-Remediation solution for drilling waste eliminates the need for a drilling reserve pit or the necessity of dumping the waste at an expansive land-based facility. In a spill situation, instead of hauling and dumping large quantities of affected soil elsewhere, Boldwater can perform treatment in place. This capability, in addition to being eco-friendly, also saves significant expenses for our clients.
Less Traffic
Oil & Gas drilling operations are usually accompanied by a large number of large and small vehicles on local roads and highways. Because Boldwater performs all services onsite, and the drilling waste never leaves the drilling lease, large vehicle traffic, and the risks associated, are significantly reduced
Benefits Summary
The Enviroment Is Protected
- Boldwater uses 100% natural microbial materials and microbial nutrients
- Our processes are vetted and permitted by the EPA and the RRC of Texas
- Boldwater assures that all waste is handled properly
- Boldwater prepares all regulatory documents throughout the treating & recycling processes
- The well site operates without interference of your drilling or other operations onsite
Site planning is simple and efficient
- Recycling is completed within hours of achieving total depth on the well
- Testing is performed by certified 3rd party labs to confirm all state and EPA control parameters are satisfied
- Bio-Remediation and recycling are performed at either the well site or at a centralized location on-lease
- Boldwater eliminates trucking, coordination risks, and liabilities associated with handling the waste
- Boldwater eliminates the heavy-hauling from the drilling site often totalling between 30 to 100 waste disposal trucks
Costs Are Reduced
- Boldwater value proposition offsets waste transfer & loading, trucking & disposal fees
- The high quality TxDOT Grade 1 or 2 Recycled Material offsets additional purchase and trucking of flexible road base material and has a beneficial use
- Permitted recycling eliminates the environmental liability otherwise associated with the drilling waste












